Contract Signed for the M11 Moscow-St. Petersburg Highway Project<"

Oct 01, 2026

The contract for Sections 7 and 8 of the Moscow-St. Petersburg highway, which will connect Russia’s two largest cities, was signed on July 20, 2015, between Two Capitals Highway LLC and the IC İçtaş and Astaldi Joint Venture.

Under the project, which will be constructed on an EPC basis, approximately 140 km of 2×3- and 2×4-lane highway, 18 bridges, 46 viaducts, and 1 tunnel are expected to be completed within 36 months.

IC İnşaat | Contract Signed for the M11 Moscow-St. Petersburg Highway Project