Craiova–Drobeta Turnu Severin–Caransebeș Railroad Rehabilitation

IC İnşaat | Craiova–Drobeta Turnu Severin–Caransebeș Railroad Rehabilitation

Project Details

Contract Type
EPC
Start Date
2025
Completion Date
It continues
Location
Romania
Total Railway Length
42 km
Tunnel
7 units – 80–400 m
Bridge
23 pieces
Station
6 pieces
Maximum Bridge/Viaduct Length
350 m
Total Length of Railways
37 km
Tunnel
4 pieces - 270–550 m
Bridge
19
Station
7 pieces
Railroad Crossing
8 pieces
The Craiova–Drobeta Turnu Severin–Caransebeș Railway Rehabilitation Project, a strategic modernization initiative aimed at bringing Romania’s railway infrastructure up to European standards

The Craiova–Drobeta Turnu Severin–Caransebeș Railway Rehabilitation Project is one of the key projects within a strategic modernization program aimed at bringing Romania’s railway infrastructure up to European standards. The project, carried out by IC İçtaş İnşaat, covers Lots 4 and 6 within the Trans-European Transport Network (TEN-T) Orient / East-Med Corridor.

As part of the project, a single-track railway line totaling 78.78 kilometers in length is being modernized to accommodate an operating speed of 120 km/h. The work includes the rehabilitation of the railway superstructure, as well as stations, stops, tunnels, bridges, viaducts, underpasses, culverts, drainage systems, signaling, and auxiliary railway infrastructure.

The project, which is being carried out along a railway corridor that remains open to traffic, is being implemented safely and without interruption using advanced engineering solutions while existing passenger and freight transportation continues. Conducted in accordance with European railway standards, the work aims to enhance the line’s safety, capacity, and operational efficiency.

Upon completion, the project will enhance the performance of passenger and freight transportation, improve regional accessibility, support international connectivity, and contribute to Europe’s sustainable rail transportation network.

Key Features

Rehabilitation of a single-track railway line with a total length of 78.78 kilometers as part of the Lot 4 and Lot 6 phases.

Construction and rehabilitation of a total of 11 railway stations, 2 stops, 11 railway tunnels, 41 railway bridges, 1 railway viaduct, 5 underpasses, and 65 culverts.

To contribute to Romania’s strategic railway modernization by enhancing railway safety, operational efficiency, regional connectivity, and the effectiveness of international transportation networks.

IC İnşaat | Rehabilitation of a single-track railway line with a total length of 78.78
IC İnşaat | Construction and rehabilitation of a total of 11 railway stations, 2 stops,
IC İnşaat | To contribute to Romania’s strategic railway modernization by enhancing railway safety, operational
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery

Project Gallery

IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery