The Project in Numbers

Contract Type
BOT - Production
Start Date
2. Runway and Apron: 2000 (Construction) 2. International Terminal: 2004 (BOT) New Domestic Terminal: 2007 (BOT)
Date of Commissioning
2. Runway and Apron: 2005 2. International Terminal: 2005 New Domestic Terminal: 2010
Location
Antalya, Turkey
Main Runway Length
3.5 km
Parallel Runway Length
3.5 km
Apron
2 units - total 590,000 m50,000 m²
High-Speed Taxi Lane
4 pieces
Connection Taxi Route
2 pieces
Terminal Area
78,000 m²
Parking Lot
73,500 m²
Passenger Bridge
12 pieces
Terminal Area
38,000 m²
Apron Area
50,000 m²
Parking Lot
28,000 m²
An infrastructure investment to expand the capacity of one of Turkey’s most important tourist airports

IC İçtaş Construction has successfully completed airside capacity expansion work at Antalya Airport to accommodate increasing passenger and flight traffic. As part of the project, the construction of a second runway, parallel taxiways, and apron expansion works were implemented, thereby strengthening the airport’s operational capacity and creating a modern infrastructure that supports simultaneous aircraft operations.

The new runway system and expanded apron areas were planned in an integrated manner with the increase in terminal capacity, enabling the safe, efficient, and uninterrupted management of the airport’s growing air traffic. The project contributes to increasing aircraft movement capacity while reducing taxi times, improving operational efficiency, and enabling more effective management of air traffic.

This investment, which contributes to the development of Antalya Airport—Turkey’s third-busiest airport and one of the Mediterranean’s most important international tourism hubs— is one of IC İçtaş İnşaat’s key reference projects, reflecting the company’s expertise in airport infrastructure, transportation engineering, and large-scale airside projects.

Key Features

It is a strategic infrastructure investment that increases the airside capacity of Antalya Airport.

The second runway, along with parallel taxiways and apron expansion projects, is increasing the efficiency of aircraft operations.

It offers modern airside infrastructure that supports simultaneous, independent takeoff and landing operations.

This is an infrastructure investment planned in conjunction with the expansion of terminal capacity.

It is one of the major transportation projects contributing to the expansion of Turkey’s third-busiest airport.

It reflects IC İçtaş Construction’s experience in airport infrastructure and airside engineering.

IC İnşaat | It is a strategic infrastructure investment that increases the airside capacity of
IC İnşaat | The second runway, along with parallel taxiways and apron expansion projects, is
IC İnşaat | It offers modern airside infrastructure that supports simultaneous, independent takeoff and landing
IC İnşaat | This is an infrastructure investment planned in conjunction with the expansion of
IC İnşaat | It is one of the major transportation projects contributing to the expansion
IC İnşaat | It reflects IC İçtaş Construction’s experience in airport infrastructure and airside engineering.
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery

Project Gallery

IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery
IC İnşaat | Project Gallery